This comprehensive ms pipe c class weight chart in kg, mm, pdf enables construction professionals to determine accurate material requirements for structural applications. Our detailed specifications support precise project planning while facilitating efficient procurement through modern b2b portal systems.
Comprehensive MS Pipe C Class Weight Chart in KG and MM Specifications
Complete MS Pipe C Class Weight Chart
Nominal Bore (MM) | Outer Diameter (MM) | Wall Thickness (MM) | Weight per Meter (KG) | Weight per 6M Length (KG) | Internal Diameter (MM) | Cross-sectional Area (cm²) |
15 (1/2") | 21.3 | 2.65 | 1.27 | 7.62 | 15.90 | 1.99 |
20 (3/4") | 26.9 | 2.87 | 1.69 | 10.14 | 21.16 | 3.52 |
25 (1") | 33.7 | 3.38 | 2.41 | 14.46 | 26.94 | 5.70 |
32 (1.25") | 42.4 | 3.56 | 3.24 | 19.44 | 35.28 | 9.78 |
40 (1.5") | 48.3 | 3.68 | 3.85 | 23.10 | 40.94 | 13.17 |
50 (2") | 60.3 | 3.91 | 5.11 | 30.66 | 52.48 | 21.65 |
65 (2.5") | 76.1 | 4.05 | 6.78 | 40.68 | 68.00 | 36.32 |
80 (3") | 88.9 | 4.05 | 7.95 | 47.70 | 80.80 | 51.29 |
100 (4") | 114.3 | 4.50 | 11.41 | 68.46 | 105.30 | 87.16 |
125 (5") | 139.7 | 4.85 | 15.06 | 90.36 | 130.00 | 132.73 |
150 (6") | 168.3 | 4.85 | 18.16 | 108.96 | 158.60 | 197.62 |
200 (8") | 219.1 | 5.40 | 26.62 | 159.72 | 208.30 | 340.85 |
250 (10") | 273.0 | 6.35 | 39.14 | 234.84 | 260.30 | 532.46 |
300 (12") | 323.9 | 6.35 | 46.72 | 280.32 | 311.20 | 760.78 |
MS Pipe C Class Material Specifications
Chemical Composition Standards
Element | Percentage Range | Standard Specification | Quality Grade |
Carbon (C) | 0.15 - 0.25% | IS 1239 Part 1 | C Class Medium |
Manganese (Mn) | 0.30 - 0.70% | IS 1239 Part 1 | Standard Grade |
Phosphorus (P) | Max 0.050% | IS 1239 Part 1 | Quality Control |
Sulfur (S) | Max 0.050% | IS 1239 Part 1 | Purity Standard |
Silicon (Si) | 0.10 - 0.40% | IS 1239 Part 1 | Structural Grade |
Mechanical Properties
Property | Value Range | Test Method | Application Standard |
Tensile Strength | 330-370 N/mm² | IS 1608 | Structural Applications |
Yield Strength | 205 N/mm² (Min) | IS 1608 | Load Bearing Capacity |
Elongation | 23% (Min) | IS 1608 | Ductility Measurement |
Hardness | 67 HRB (Max) | IS 1608 | Surface Durability |
Professional Procurement Through B2B Portal Integration
Modern construction procurement leverages specialized b2b portal platforms for streamlined ms pipe c class sourcing. These digital marketplaces provide instant access to verified suppliers with comprehensive weight chart databases, enabling accurate quantity calculations and competitive pricing analysis.
Digital Documentation Benefits
Converting traditional specifications to pdf format ensures universal accessibility across project teams. The pipex.ai platform facilitates seamless integration between weight chart data and construction management systems, providing real-time material tracking capabilities.
Application-Specific Weight Calculations
Water Supply Systems
Pipe Size | Application Type | Standard Length | Total Weight (KG) | Installation Factor |
25mm | Residential Supply | 100 meters | 241.0 | 1.15x |
50mm | Commercial Supply | 100 meters | 511.0 | 1.20x |
100mm | Industrial Supply | 100 meters | 1141.0 | 1.25x |
150mm | Municipal Supply | 100 meters | 1816.0 | 1.30x |
Structural Framework Applications
Configuration | Pipe Combination | Total Weight per Unit | Load Capacity | Safety Factor |
Column Support | 150mm + 100mm | 29.57 KG/meter | 85 kN | 2.5 |
Beam Framework | 100mm + 80mm | 19.36 KG/meter | 62 kN | 2.2 |
Truss Assembly | 80mm + 65mm | 14.73 KG/meter | 45 kN | 2.0 |
Quality Assurance and Testing Standards
Hydrostatic Testing Requirements
MS pipe c class undergoes rigorous pressure testing to ensure structural integrity. Standard test pressures range from 2.5 to 4.0 MPa depending on nominal bore specifications, with testing duration maintained for minimum 10 seconds per IS 1239 standards.
Surface Treatment Specifications
Treatment Type | Application Method | Coverage (g/m²) | Corrosion Resistance |
Hot Dip Galvanizing | Immersion Process | 610 minimum | 15-20 years |
Zinc Coating | Electroplating | 275 minimum | 8-12 years |
Primer Coating | Spray Application | 125 minimum | 5-8 years |
Advanced Procurement Solutions
The pipex.ai ecosystem revolutionizes construction material sourcing by providing integrated weight calculation tools and supplier network access. This technology enables automated quantity estimation based on project blueprints, reducing procurement errors and optimizing material utilization.
Cost Optimization Strategies
Understanding precise ms pipe c class weight specifications enables accurate transportation planning and storage requirements. These calculations directly impact project budgets through optimized logistics arrangements and inventory management protocols.
Conclusion
This comprehensive ms pipe c class weight chart provides construction professionals with essential specifications for accurate project planning and material procurement. Utilizing standardized weight data in accessible pdf formats, combined with modern b2b portal integration, ensures efficient project execution while maintaining quality standards across all construction applications.